Hispanic Business Features ACE Assessment Service by Future Facilities

Share

Hispanic Business recently featured Future Facilities’ ACE Assessment Service, an offering designed to help facilities managers measure their performance gap. From the article:

Future Facilities, Inc., a leading provider of data center design and operational management software, announced the launch of its ACE Data Center Performance Assessment Service, a new offering to assess and visualize three critical indicators of data center performance – Availability, Capacity and Efficiency. Future Facilities ACE Assessment. (Graphic: Business Wire) Every data center faces roadmap changes. Each change has the potential to chip away at one or more of the interconnected performance indicators. Successful data center operation is about winning the battle against change by planning changes from a known performance baseline.

The ACE Assessment starts with the creation of a Predictive Model (Virtual Facility) of the data center using 6SigmaDC software. The Virtual Facility is then used to calculate the following performance indicators: Availability: % of existing connected IT load that will always be available under what if power and cooling failure conditions Capacity: % of the design IT load that can be achieved by adding to the present day layout Efficiency: The effectiveness of airflow and temperature delivery (compared to ASHRAE standards)

ACE is the only service available that allows operators to visually plot their ‘performance gap’ – the difference between maximum design potential and real-world operational potential. The ACE Service also pinpoints potential improvements to close the performance gap.

“We developed ACE as a new way to assess and visualize the performance state of the data center and to help the operator get to where they need to go to close the ‘performance gap,'” said Sherman Ikemoto, Director ofFuture Facilities, Inc.

In 2011, using the tools of the ACE Assessment Service, Future Facilities was able to help a global investment bank increase availability to 100%, reclaim 350Kw of lost capacity, and realize a 15% drop in PUE.

For more information on the ACE Assessment Service, please visit: www.futurefacilities.com/ACE.

In October, Future Facilities announced Release 8 of its 6SigmaDC software, giving users enhanced connectivity to third-party live data sources (such as sensors, servers, PDUs, ACUs), and the ability to incorporate predictive modeling into their DCIM workflows.

Read the full article at Hispanic Business.